print version 

Find company
Home About the ProjectContact usFor the Clients
Enter code or ISIN
 
alpha / industry search

Issuers' Corner
Press Releases
Annual Reports Library

Financial Statements
SEC & FFMS Filings
Corporate Presentations
GM Materials
Issues Documents
Corporate Governance Materials
Russian Company Guide
Company Profiles
Corporate Calendar
Markets Corner
Consensus Estimates
Media Corner
News Line


Get updates



Home  Issuers' Corner  Press Releases REGISTER LOG IN

Press Releases

company search
all press releases
all Atomenergoprom press releases

Atomenergoprom

September 24, 2009

JSC Atomenergoprom is completing off-line testing and commissioning of automated process control system at Unit 1 of Busher NPP site

JSC Electrogorsk Research and Engineering Center on Nuclear Power Plants Safety (EREC, a 100% affiliate of JSC Atomenergoprom) is completing works on installing automated process control system (APCS) for unit 1 of Busher NPP (Iran). The work is conducted within the framework of the APCS strategy, approved by the general contractor of the project, CJSC Atomstroyeksport and implemented during 1998 – 2009 period.

JSC EREC is conducting APCS turn-key commissioning works. The company participated in developing the project and software-hardware means testing concept, carried out integration testing at a testing site, coordinated manufacturing, procurement and commissioning of the equipment.

The APCS project was elaborated by JSC Atomenergoproekt (Moscow, 100% affiliate of Atomenergoprom). The project provides for the NPP unit display control method. It is a fully home-grown authentically licensed technology meeting all requirements of Nuclear Energy Regulations and successfully underwent a number of integral evaluations conducted by IAEA.

The JSC EREC’s APCS division with participation of the equipment suppliers has recently conducted adjustment within the framework of preparation for 250/110atm hydro-testing of 1 and 2 circuits and commissioned for pilot operation the following:

- top-level unit system and facility control desk operational dispatch management hardware;

- monitoring and control system of electric equipment, ventilation systems, reactor, turbine island and special building automatic fire protection system;

- process safety-related systems.

Besides this reactor specific systems are being adjusted.

These works are part of preparation for hot operational testing. JSC EREC is a real experiencer in development, procurement, testing, integration and commissioning of APCS at Busher 1 NPP.

 

 

 

Search by industry

Agriculture, Foresty and Fishing | Chemicals | Engineering | Ferrous Metals | Financial, Insurance & Real Estate | Food & Kindred Products | General Construction | Information Technology | Media & Publishing | Non-Ferrous Metals | Oil & Gas | Pharmaceuticals | Power Industry | Precious Metals and Diamonds | Telecommunications | Transportation | Wholesale & Retail Trade

Search by alpha index

A B C D F G H I K L M N O P R S T U V W X Z


Site Map
© RUSTOCKS.com
Privacy Statement | Disclaimer