print version 

Find company
Home About the ProjectContact usFor the Clients
Enter code or ISIN
 
alpha / industry search

Issuers' Corner
Press Releases
Annual Reports Library

Financial Statements
SEC & FFMS Filings
Corporate Presentations
GM Materials
Issues Documents
Corporate Governance Materials
Russian Company Guide
Company Profiles
Corporate Calendar
Markets Corner
Consensus Estimates
Media Corner
News Line


Get updates



Home  Issuers' Corner  Press Releases  TGC-1 REGISTER LOG IN

Press Releases > TGC-1  all about the company

company search
all press releases
all TGC-1 press releases

TGC-1

January 31, 2018

TGC-1 increased electricity output by 6.6% in 2017

According to 2017 results, the electricity production volume of TGC-1, including PJSC Murmanskaya CHPP, amounted to 29,509.3 million kWh, having increased by 6.6% compared to 2016.

TGC-1 electricity output summary (million kWh)

 

2016

2017

Difference

Nevsky branch

16,687.4

18,178.7

+8.9%

Karelsky branch

3,701.6

4,051.4

+9.5%

Kolsky branch

7,266.6

7,263.2

0%

TGC-1 total

27,655.6

29,493.3

+6.6%

PJSC Murmanskaya CHPP

16.8

16.0

-4.8%

TGC-1 total, including

PJSC Murmanskaya CHPP

27,672.4

29,509.3

+6.6%

In 2017, electricity output of CHPPs increased by 6.8% compared to 2016. The major growth factors are as follows:

  • the increase of demand in the Northwest of Russia;
  • increased load of the stations upon the request of the System Operator of Unified Power System;
  • commissioning of a new high-efficiency gas turbine power unit at the Power Plant No.1 of the Centralnaya CHPP.

The comparable electricity output by HPPs increased by 6.4% due to the higher water content at the Nevsky and Karelsky branches.

TGC-1 heat output from headers summary (thousand Gcal)

 

2016

2017

Difference

Nevsky branch

19,123.3

19,286.1

+0.9%

Karelsky branch

1,704.6

1,709.8

+0.3%

Kolsky branch

1,502.5

1,515.5

+0.9%

TGC-1 total

22,330.4

22,511.4

+0.8%

PJSC Murmanskaya CHPP

2,114.6

2,203.2

+4.2%

TGC-1 total, including

PJSC Murmanskaya CHPP

24,445.0

24,714.6

+1.1%

According to 2017 results, the volume of heat output from headers of TGC-1, including PJSC Murmanskaya CHPP, comprised 24,714.6 thousand Gcal, which is 1.1% higher compared to 2016, due to the prolonged heating period.

Average specific consumption of fuel equivalent for electricity and heat output at TGC-1 has remained at the level of comparable values, amounting to 208.7 g/kWh and 169.2 kg/Gcal, respectively.

For more information about the results of the company’s production activities, please visit the Reports section of the corporate website.

About

TGC-1 is the leading producer of electricity and heat in the North-West region of Russia. It operates 53 electric generating stations in four regions of Russia: St. Petersburg, Republic of Karelia, Leningrad Oblast, and Murmansk Oblast.

TGC-1 installed electric capacity of the Company’s stations amounts to 6.95 GW and heating capacity of 13.65 thousand Gcal/hr. Major shareholders are Gazprom Energoholding LLC (51.79 %) and Fortum Power and Heat Oy (29.45 %). Total headcount of the Company, including subsidiaries, totals circa 7 thousand.

 

 

 

Search by industry

Agriculture, Foresty and Fishing | Chemicals | Engineering | Ferrous Metals | Financial, Insurance & Real Estate | Food & Kindred Products | General Construction | Information Technology | Media & Publishing | Non-Ferrous Metals | Oil & Gas | Pharmaceuticals | Power Industry | Precious Metals and Diamonds | Telecommunications | Transportation | Wholesale & Retail Trade

Search by alpha index

A B C D F G H I K L M N O P R S T U V W X Z


Site Map
© RUSTOCKS.com
Privacy Statement | Disclaimer